The Pascommuck Conservation Trust

Preserving our past. Protecting our future.

  • Facebook
  • YouTube
  • Home
  • News & Events
    • Events Calendar
    • News & Events
    • Newspaper articles archives
  • Get Involved
    • Join The Trust / Make a donation!
    • Become a Volunteer
    • Attend a board meeting
    • Other Ways to Help
    • Archive for Get Involved
  • Contact Us
  • Protect Your Land
  • Properties
    • Mutter’s Field Accessible Trail
    • Brickyard Brook Conservation Area
    • Broad Brook Meadows Conservation Area
    • Edward J. Dwyer Conservation Area
    • Hannum Brook Conservation Area
    • John Bator Park Conservation Area
    • Old Pascommuck Conservation Area
    • Old Trolley Line Conservation Area
    • Pomeroy Meadows Conservation Area
    • White Brook Plains Conservation Area
    • Archive for Properties
  • Trail Maps
    • Map of all PCT properties
    • Brickyard Brook Conservation Area/Mutter’s Field Accessible Trail
    • Broad Brook Meadows Trail Map
    • Edward Dwyer Conservation Area Trail Map
    • Hannum Brook Conservation Area Trail Map
    • Old Pascommuck Conservation Area Trail Map
    • Old Trolley Line Trail Map
    • Pomeroy Meadows Trail Map
  • About Us
    • Contact Us
    • Board Meetings/Board of Directors
    • President’s reports – Annual Meetings
    • Current Newsletter
    • Bylaws
    • Financials (Form 990)
    • Newsletter Archive
    • Video Archive
Home > Property maintenance > Two bridges replaced at two PCT properties

Two bridges replaced at two PCT properties

October 31, 2022 by Michael Caron

Bridges were recently replaced at both the Dwyer Conservation area as well as at Pomeroy Meadows Conservation area. The bridge at Dwyer consisted of mainly replacing the wooden bridge across the first major wetland are with another wooden bridge. However the bridge at Pomeroy Meadows consisted of switching out the wooden bridge with one consisting of aluminum girders as well as aluminum railings. Some of the rotted steps were also replaced on the stairs located after the bridge. Thanks to the work parties who managed the demolishing of the old bridges and the reconstruction of the new and improved ones.

  • Dwyer bridge repacement
  • Dwyer bridge replacment
  • Dwyer bridge replacement
  • Dwyer bridge replacement
  • Pomeroy bridge materials delivery
  • Pomeroy bridge materials delivery
  • Pomeroy bridge materials delivery
  • Pomeroy bridge materials delivery
  • Pomeroy bridge replacement
  • Pomeroy bridge replacement
  • Pomeroy bridge replacement
  • Pomeroy stair replacement
  • Pomeroy stair replacement
  • Pomeroy stair replacement

Filed Under: Featured, News and Events, Property maintenance

Consider donating today! If applying for membership indicate membership under designation.

Donate today

Copyright © 2025 Pascommuck Conservation Trust · PO Box 806 Easthampton, MA 01027
Design by Jo Landers
Free Nonprofit Hosting courtesy of DreamHost